Hydroelectric, Power & Water Systems
Wind Power Plant Auxiliary Automation
Wind facilities may require integration and monitoring for auxiliary cooling, lubrication support and balance-of-plant equipment. PLC/SCADA work can present available status, alarm and process signals and exchange approved supervisory data with turbine systems. Turbine-specific control and safety remain with the designated turbine controller and approved safety systems. Automation scope depends on the equipment, operating sequence, existing controls and process requirements. Share the machine details and desired outcome to define a suitable control approach.